Facilities Planning Records,1981-2005
Last Updated
Overview of the Collection
Repository:
Special Collections & Archives
McIntyre Library
University of Wisconsin – Eau Claire
P.O. Box 4004
105 Garfield Ave.
Eau Claire, WI 54702 – 4004
(715) 836-2739
https://library.uwec.edu/archives/
Reference Code: USGZE AS595
Accession Number: 12-029
Collection Number: Archives Series 595
Creators: University of Wisconsin—Eau Claire. Facilities Planning. (Eau Claire, Wis.)
Title: Facilities Planning Records
Dates: 1981-2005
Quantity: 8.0 linear feet (8 record cartons)
Location of Collection: C10/1f-C10/1h
Languages: Collection materials are in English.
Summary: Files relating to remodeling and renovations for buildings related to the University of Wisconsin—Eau Claire.
Content Description
This series includes files associated to the remodeling, renovations and repairs of buildings and grounds on the University of Wisconsin—Eau Claire campus. Materials include handicapped accessibility studies, renovation project plans, and budgets. Some folders also contain correspondence files linked to particular campus buildings and grounds.
Administrative Information
Acquisition Information: Transferred to the University Archives by Facilities Planning in June 2010.
Access Restrictions: Collection is open to the public.
Use Restrictions: Researchers are responsible for using in accordance with 17 U.S.C. Copyright owned by the University of Wisconsin – Eau Claire.
Preferred Citation: Facilities Planning Records, 1981-2005. AS595 Special Collections & Archives. McIntyre Library. University of Wisconsin – Eau Claire. Eau Claire, WI.
Processing Note: Processed by Jennifer Murray in April 2012.
Arrangement: Flat.
OCLC #: 785417041
Subjects
Corporate Names: University of Wisconsin—Eau Claire
Subject Terms: Buildings, master plans, repair, remodeling, renovation, budget, handicapped accessibility, construction, residence halls, repair, parking, correspondence
Geographical Terms: Eau Claire, Wisconsin
Detailed List of Contents
Dates: 1981-2005
Extent: 8.0 linear feet (8 record cartons)
Container
Contents
Dates
Box/Folder
1/1
Brewer/Kjer/Zorn/Capital Renewal Project
1993-1995
Box/Folder
1/2
Brewer Hall
1998-1999
Box/Folder
1/3
Brewer/Kjer/C.S./Zorn Capital Renewal Project; Zorn Arena Window Replacement
1993-1995
Box/Folder
1/4
Brewer Capital Renewal Project
1993-1995
Box/Folder
1/5
Brewer/Kjer/Zorn Capital Renewal Project
1993-1995
Box/Folder
1/6
Brewer/Kjer/Zorn Capital Renewal Project
1993-1995
Box/Folder
1/7
Brewer/Kjer/Zorn Capital Renewal Project
1993-1995
Box/Folder
1/8
Brewer/Kjer/Zorn Arena Handicapped Accessibility Study
1985
Box/Folder
1/9
Campus School Handicapped Accessibility Study
1993
Box/Folder
1/10
Crest Wellness Health Services Office/Conference Area/Lab
1991-1995
Box/Folder
1/11
Crest Wellness Center Handicapped Accessibility Study
1985, 1987-1989
Box/Folder
1/12
Recreational/Wellness Swim Center
1995-1997
Box/Folder
1/13
CWC Major Renovation Project
1997-1999
Box/Folder
1/14
CWC Renovation; RVA Correspondence
1998
Box/Folder
1/15
Crest Wellness Major Renovation
1983
Box/Folder
1/16
Crest Wellness Major Renovation
1997-1999
Box/Folder
1/17
Crest Wellness Center Renovation
1998
Box/Folder
1/18
CWC Major Renovation Project
1996
Box/Folder
1/19
CWC Major Renovation Project
1997
Box/Folder
1/20
CWC Major Renovation Project
1998-1999
Box/Folder
2/1
Davies Center UGST
1994
Box/Folder
2/2
Davies Center Communications Wiring
1995
Box/Folder
2/3
Davies Center Ballast Replacement
1994
Box/Folder
2/4
Davies Center Handicapped Accessibility Study
1985, 1989-1991
Box/Folder
2/5
Haas Fine Arts – Art Wing Ventilation Improvement
1993, 1995-1997
Box/Folder
2/6
Haas Fine Arts Ceramic Kiln Replacement
1997
Box/Folder
2/7
Haas Fine Arts Footbridge Repair
1996-1997
Box/Folder
2/8
Haas Fine Arts Steam Conduit Repair
1993
Box/Folder
2/9
Haas Fine Arts Music Library/Listening Facility
1994
Box/Folder
2/10
Haas Fine Arts Handicapped Accessibility Study
1985
Box/Folder
2/11
Heating Plant Coal Storage Expansion
1998
Box/Folder
2/12
CHP Electrical Transformer Repair and Replacement
1995
Box/Folder
2/13
Central Heating Plant Stoker Clips Budget
1994
Box/Folder
2/14
Heating Plant One & Two Oil Burner Safety Maintenance
1994
Box/Folder
2/15
Central Heating Plant Chimney Repair Budget
1994
Box/Folder
2/16
Central Heating Plant Generator Replacement
1992
Box/Folder
2/17
Central Heating Plant Handicapped Accessibility Study
1993
Box/Folder
2/18
State Owned and Leased Buildings Handicapped Accessibility Study
1984
Box/Folder
2/19
Hibbard Ventilation Improvement
1997-1998
Box/Folder
2/20
Hibbard HVAC Renovation
1998
Box/Folder
2/21
Hibbard HVAC Renovation
1997-1998
Box/Folder
2/22
HHH HVAC Renovation
1995-1997
Box/Folder
2/23
HHH HVAC Renovation
1998
Box/Folder
2/24
HHH HVAC Renovation
1996
Box/Folder
2/25
HSS Building Air Balance Investigation
1995
Box/Folder
2/26
Hibbard Elevator Project
1995
Box/Folder
2/27
HHH UST Removal/Indoor Tank Installation
1993
Box/Folder
2/28
Hibbard Hall Handicapped Accessibility Study
1985
Box/Folder
3/1
Hilltop Cooling Tower Replacement
1993-1994, 1996-1997
Box/Folder
3/2
Hilltop Kitchen Remodeling Correspondence
1995
Box/Folder
3/3
Hilltop Kitchen Remodeling Budget
1995-1997
Box/Folder
3/4
Hilltop Dining Room/Kitchen Remodeling
1993, 1995-1997
Box/Folder
3/5
Hilltop Kitchen/Serving Remodeling
1995-1997
Box/Folder
3/6
Hilltop Food Court Remodeling
1993-1994
Box/Folder
3/7
Hilltop Center Handicapped Accessibility Study
1985
Box/Folder
3/8
Human Sciences & Services Teaching Lab
1995-1997
Box/Folder
3/9
Human Sciences & Services Revisions
1997-1998
Box/Folder
3/10
HSS Building Roof Replacement
1995
Box/Folder
3/11
Human Sciences & Services Handicapped Accessibility Study
1985
Box/Folder
3/12
Library Chiller
1995
Box/Folder
3/13
Library Groundwater Investigation
1997
Box/Folder
3/14
Old Library Elevator
1996, 2000
Box/Folder
3/15
Library East Entrance Door Renovation
1994-1998
Box/Folder
3/16
Library Handicap Accessibility Improvement
1993-1996
Box/Folder
3/17
Library Chiller Tube Replacement
1992-1993
Box/Folder
3/18
Library Handicapped Accessibility Study
1985
Box/Folder
3/19
Maintenance & Central Stores Ventilation/Grounds Equipment
1995
Box/Folder
3/20
McPhee Heating & Ventilation
1996-1998
Box/Folder
3/21
McPhee
1993
Box/Folder
3/22
McPhee Physical Education Handicapped Accessibility Study
1985
Box/Folder
3/23
Nursing Asbestos Abatement/Floor Tile Replacement
1995-1996
Box/Folder
3/24
Nursing
1994-1996
Box/Folder
3/25
Remodel School of Nursing Distance Education Classroom
1995
Box/Folder
3/26
Nursing Building Handicapped Accessibility Study
1985
Box/Folder
4/1
Phillips Hall & Addition – Major Renovation
1997-1999
Box/Folder
4/2
Phillips
1997
Box/Folder
4/3
Phillips Multimedia Classroom
1996-1997
Box/Folder
4/4
Instructional Technology Improvement at Phillips Hall
1996
Box/Folder
4/5
Instructional Technology Improvement Electrical Work – Phillips Hall
1997
Box/Folder
4/6
Instructional Technology Improvement General & HVAC Work – Phillips Hall
1997
Box/Folder
4/7
Phillips Eyewashes
1996
Box/Folder
4/8
Phillips Capital Renewal
1995-1997
Box/Folder
4/9
Phillips Capital Renewal Project
1995-1997
Box/Folder
4/10
Phillips Chemical Stockroom
1996-1998
Box/Folder
4/11
Phillips Hall Electron Microscope Center Correspondence
1993-1995
Box/Folder
4/12
Phillips Hall Electron Microscope Center Budget
1993-1995
Box/Folder
4/13
Phillips Electron Microscope Center
1993-1995
Box/Folder
4/14
Phillips Electron Microscope Center
1993-1995
Box/Folder
4/15
Phillips Chemistry Lab Remodeling
1993-1997
Box/Folder
4/16
Phillips Chemistry Lab Remodeling
1994
Box/Folder
4/17
Phillips Chemistry Lab Rooms
1989, 1993
Box/Folder
4/18
Phillips Hall Handicapped Accessibility Study
1985
Box/Folder
4/19
SSS Fan Motor & Controls Replacement
1996
Box/Folder
4/20
SSS First Floor Remodeling
1992-1994
Box/Folder
4/21
Schneider Hall Handicapped Accessibility Study
1985
Box/Folder
4/22
Schofield Hall Sewer & Water Replacement Budget
1985-1995
Box/Folder
5/1
Schofield Access to Restrooms
1994-1995
Box/Folder
5/2
Schofield Canopy Roof
1991-1995
Box/Folder
5/3
Schofield Uninterruptable Power Supply
1993-1995
Box/Folder
5/4
Schofield Hall Correspondence
1993
Box/Folder
5/5
Schofield Hall Handicapped Accessibility Study
1985
Box/Folder
5/6
Zorn Arena Shower Project
1994-1999
Box/Folder
5/7
Tennis Court Resurfacing
2000
Box/Folder
5/8
Telecommunications Cabling
1998
Box/Folder
5/9
Energy Management Campus-Wide
1998
Box/Folder
5/10
Ice/Rollerblading Hockey Rink Grounds
1997
Box/Folder
5/11
Ice/Rollerblading Hockey Rink Grounds
1997
Box/Folder
5/12
Campus Building Controllers Network Completion HSS/HHH/CWC/NUR/TOWERS
1997
Box/Folder
5/13
Backflow Prevention Valves Campus Wide
1998
Box/Folder
5/14
Structured Cabling & Fiber Optic
1997
Box/Folder
5/15
Grounds Correspondence File
1981, 1990, 1996
Box/Folder
5/16
Nine Campus Intrabuilding Cabling
1993-1996
Box/Folder
5/17
Campus Emergency Telephone System
1995
Box/Folder
5/18
Lower Campus Fire Protection System Study
1993
Box/Folder
5/19
Primary Electrical Distribution Repairs
1993-1995
Box/Folder
5/20
Energy Management System Upgrade (Campus-wide)
1993
Box/Folder
5/21
Carson Park Football/Baseball Stadium Renovation
1995
Box/Folder
5/22
Disabled Access Grounds
1995-1996
Box/Folder
5/23
Redesign Basketball Court by Horan Hall – Grounds
1995
Box/Folder
5/24
Upper Campus Lighting
1994-1995
Box/Folder
5/25
Lower Campus Security Pole Lights – Grounds
1995
Box/Folder
5/26
Structural Coat Track Resurfacing (Simpson Field)
1992
Box/Folder
5/27
Stein Field Electrical Grounds
1996-1997
Box/Folder
5/28
Floodplain Compliance
1999
Box/Folder
5/29
State Owned & Leased Buildings Handicapped Accessibility Study
1985
Box/Folder
5/30
Replace Elevator Hydraulic Cylinders – Various Buildings
1997-1999
Box/Folder
5/31
Central Heating Plant Resurfacing
1996
Box/Folder
5/32
Central Heating Plant Coal Scale Replacement
1997
Box/Folder
5/33
Water Street Stairs Replacement
1992-1993
Box/Folder
5/34
Campus-wide Elevator Emergency Telephones
1994
Box/Folder
5/35
Governor’s Parking Lot Phases 1 & 2
2003
Box/Folder
5/36
Bollinger Field Parking Lot and Lighting
2004-2005
Box/Folder
5/37
Parking Lots/Roadways Correspondence File
1996
Box/Folder
5/38
Athletic/Rec Field Development Parking (D.O.T.)
1993-1995
Box/Folder
5/39
Sacred Heart Parking Lot
1998
Box/Folder
6/1
Simpson Field Hammerthrow
1996-1997
Box/Folder
6/2
Stein Field Storage Building (Bollinger Field)
1997-1998
Box/Folder
6/3
Stein Parking Lot Expansion
1997
Box/Folder
6/4
University Drive Reconstruction
2000
Box/Folder
6/5
Putnam Park Trail Alternative Evaluation
2004
Box/Folder
6/6
Phillips Roof Replacement
1996
Box/Folder
6/7
Davies Center Roof
1996
Box/Folder
6/8
Hibbard Roof Repairs
1995
Box/Folder
6/9
Roofing Correspondence
1990-1992
Box/Folder
6/10
Sodexho
2002-2003
Box/Folder
6/11
WEI III
2002-2003
Box/Folder
6/12
Bridgman Toilet/Shower Partitions
1996-1997
Box/Folder
6/13
Bridgman Asbestos Abatement/Floor Tile Replacement
1996-1997
Box/Folder
6/14
Bridgman Windows/Screens/Doors
1994-1995
Box/Folder
6/15
Chancellors New Construction
1993-1998
Box/Folder
6/16
Chancellors New Construction
1995-1999
Box/Folder
6/17
Chancellors New Construction
1996, 1998
Box/Folder
6/18
Design/Build Multi-Story Apartment Style Residence Hall
1998
Box/Folder
6/19
Design/Build Multi-Story Apartment Style Residence Hall
1998
Box/Folder
6/20
Residence Hall Building Committee
1997
Box/Folder
7/1
New Residence Hall
1997-1999
Box/Folder
7/2
New Residence Hall
1994-1997
Box/Folder
7/3
New Residence Hall
1996-1997
Box/Folder
7/4
New Residence Hall
1997-1998
Box/Folder
7/5
Governors Toilet Partition Replacement
1994-1995
Box/Folder
7/6
Governors Hall Handicapped Accessibility Study
1985
Box/Folder
7/7
Horan Toilet/Shower Partitions
1997-1998
Box/Folder
7/8
Horan Asbestos Abatement/Floor Tile Replacement
1997-1998
Box/Folder
7/9
Horan Hall Handicapped Accessibility Study
1985
Box/Folder
7/10
Murray Toilet/Shower Room Partitions & Plumbing
1998
Box/Folder
7/11
Oak Ridge & Murray Halls Handicapped Accessibility Study
1985
Box/Folder
7/12
Oak Ridge Roof Replacement
1993, 1995
Box/Folder
7/13
Putnam Asbestos Abatement/Floor Tile Replacement
1996-1997
Box/Folder
7/14
Putnam Electrical Renovation Data Cabling
1997
Box/Folder
7/15
Putnam Hall Handicapped Accessibility Study
1985
Box/Folder
7/16
Sutherland Shower Room Partitions & Plumbing
1996-1997
Box/Folder
7/17
Sutherland Floor Tile/Asbestos Abatement
1995
Box/Folder
7/18
Sutherland & Bridgman Halls Handicapped Accessibility Study
1985
Box/Folder
8/1
Thomas Ceramic Wall Tile Replacement
1997
Box/Folder
8/2
Thomas Shower Rooms/Restroom Replacement
1994-1996
Box/Folder
8/3
Thomas Electrical Renovation
1988, 1994-1997
Box/Folder
8/4
Thomas Asbestos Abatement/Floor Tile Replacement
1995-1996
Box/Folder
8/5
Thomas Hall Handicapped Accessibility Study
1985-1987
Box/Folder
8/6
Towers Patio/Drain Replacement
1997-1998
Box/Folder
8/7
Towers Elevator Cylinder Replacement
1995
Box/Folder
8/8
Towers South Replacement of main Transformer
1994
Box/Folder
8/9
Towers South Shower Safing Replacement
1995-1996
Box/Folder
8/10
Towers South Shower Safing Replacement
1993
Box/Folder
8/11
Towers Stairwell Door/Hardware Replacement
1992-1993
Box/Folder
8/12
Towers Hall Handicapped Accessibility Study
1985
Box/Folder
8/13 – 8/18
Space Analysis
1980s