Planned Summer 2002 Projects:
McPhee Pool Cleaning McPhee pool will be closed May 20 - June 5
Arena Floor Refinishing Arena will be closed August 12 - 16
Sidewalk Repair Various areas will be closed at times during the summer.  Methods of advanced notice will be used such as signs.
Footbridge Repair Closed to vehicle traffic for 21 days.  No plans to close footbridge to pedestrian traffic.  Methods of advanced notice will be used such as signs.
Replace Governors Hall Water Heater Construction to begin shortly following commencement and continuing into late summer.
Remodel Schneider Hall Rms 101/103/204 Construction to begin shortly following commencement and continuing into late summer.
Fire Hydrant Relocation & Valve Installation Upper campus will be without water for about six hours occurring between May 20 - 24.  Buildings shut off will be the State Office Building, Maintenance & Central Stores, Towers, Heating Plant, Horan, Governors, Crest Wellness, Sutherland, Bridgman, Oak Ridge and Chancellors Hall. 
Road & Parking Lot Repair Late summer paving work expected to be done on Schneider Parking Lot, Phillips Lot, drive and parking areas from Phillips Lot to the Davies Bookstore Loading Dock, road in from of Nursing and Haas Fine Arts Loading Dock.  Methods of advance notice will be used such as signs.